Support for the installation of charging stations

Support for the installation of charging stations

Take advantage of public support and save money.

How does it work?

Make a request LEA support.

Fill in the form to get a proposal for a charger.

Leave the installation of your charging station to our team.

Get compensation from the state.

Who can benefit?

Physical
persons

Detached house,
garden

Multi-apartment
(yard, garage)

30 – 40%

45 – 60%

Legal
persons

Workplaces

Multi-apartment community

20 – 30%

80%

Who can benefit?

Physical
persons

Detached house, garden

Multi-apartment
(yard, garage)

30 – 40%

45 – 60%

Legal persons

Company, institution, organisation

Multi-apartment community

20 – 30%

80%    

More detailed funding information

Natural persons
Detached house, garden
FUNDED STOPS
FROM AMMOUNT
INTENSITY
SOURCE
Up to 11 kW
(inclusive)
On the wall
On the rack
In DLM *
With DLM *
In DLM *
With DLM *
1334.67 €
1577,57 €
1451.10 €
1694.00 €
40 %
533.87 €
631.03 €
580.44 €
677.60 €
Up to 22 kW
(inclusive)
On the wall
On the rack
In DLM*
With DLM*
In DLM*
With DLM*
1622,28 €
1865.18 €
2101.63 €
2344.53 €
30 %
486.68 €
559.55 €
630.49 €
703.36 €
* DLM - Dynamic Power Manager. More at
Multi-apartment (yard, garage)
FUNDED STOPS
FROM SUMA
INTENSITY
SOURCE
Up to 11 kW
(inclusive)
On the wall
On the rack
In DLM*
With DLM*
In DLM*
With DLM*
1334.67 €
1557,57 €
1451.10 €
1694.00 €
60 %
800,80 €
946,54 €
870,66 €
1016,14 €
Up to 22 kW
(inclusive)
On the wall
On the rack
In DLM*
With DLM*
In DLM*
With DLM*
1622,28 €
1865.18 €
2101.63 €
2344.53 €
45 %
730,03 €
839,33 €
945,74 €
1055,04 €
* DLM - Dynamic Power Manager. More at
Legal persons
Company, institution, organisation
FUNDED STOPS
FROM SUMA WITHOUT VAT
FROM SUMA WITH VAT
INTENSITY
SOURCE WITHOUT VAT
SOURCE WITH VAT
On the wall
On the ground
On the wall
On the ground
1985.93 €
3323.82 €
1985.93 €
3323.82 €
2402.98 €
4021.81 €
2402.98 €
4021.81 €

30%

20%

qualify as a "large enterprise"
595.78 €
997.15 €
397.19 €
664.76 €
720.89 €
1206.54 €
480.60 €
804.36 €
Multi-apartment community
FUNDED STOPS
FROM SUMA WITHOUT VAT
FROM SUMA WITH VAT
INTENSITY
SOURCE WITHOUT VAT
SOURCE WITH VAT
On the wall
On the ground
1985.93 €
3323.82 €
2402.98 €
4021.81 €

80%

1588.74 €
2659.06 €
1922.38 €
3217.45 €


Important!
The amounts shown are based on the installation of 1 charging station with 1 access, but funding is available for the installation of more charging access.

Conditions for funding:

For natural persons

  • AC charging station (3.7 / 11 / 22 kW).
  • Dynamic Power Management (DLM) device – optional (different funding amount).
  • Only new and previously unused equipment and related components.
  • The station built on the ground must meet at least the IK-08 impact resistance class.
  • The outdoor station shall have a dust and moisture resistance rating of at least IP-54.
  • Project duration – 12 months.

For legal persons

  • AC charging station with access point(s) up to 44 kW combined.
  • OCPP 1.6 communication protocol and billing/accounting functionality (for charging stations).
  • A Dynamic Power Management (DLM) device is mandatory.
  • Only new and previously unused equipment and related components.
  • The station built on the ground must meet at least the IK-08 impact resistance class.
  • The outdoor station shall have a dust and moisture resistance rating of at least IP-54.
  • Project duration – 12 months. with the possibility of a further 6-month extension.

Good to know

!

Applications are open to natural and legal persons who have purchased and installed charging stations after 01.04.2023.

!

One applicant can submit only 1 application, but there is no limit to the number of charging accesses and real estate objects in it.

!

You can apply before you have installed an EV charging point.

!

There are no requirements for the completeness of individual houses/buildings, and stops can be installed in unfinished buildings.

How long will it take?

1.

Submission of an application

2.

It is valued up to 40 days.

3.

If the answer is yes, the project is given 12 months to complete.

4.

Payment request
Submission

For more information on the funding, please visit the Lithuanian Energy Agency website.
Instructions for completing the application:
for a private house
,
for an apartment building
.

About the project

The project for the installation of private electric vehicle charging access points aims to expand the network of charging stations in the country by financing the installation of charging points in individual houses and near apartment blocks, where most of the country’s population and potential EV users live. The aim is also to allow residents to charge their EVs at their workplaces.

44 months.

The project will run for 44 months (2022.09 – 2026.03).

45 million. EUR.

The project is funded by the Next Generation Lithuania Plan (EUR 44 552 506.4) and the State Budget
(EUR 389 951.31).

53,2 thousand.

This is the number of private EV charging points installed and operational that the project aims to achieve. Access is provided in households, courtyards of apartment blocks and workplaces.

The project is financed by the Recovery and Resilience Facility and the State Budget of the Republic of Lithuania under the Plan
“Next Generation Lithuania”
.