Apartment buildings

A charging station in an apartment building – mission possible.

Our services

Charging station in an apartment building

A charging point in an apartment block can be located in a private parking space or, in the absence of a private parking space, in a shared parking area (requires a plot of land owned by the building community).

In a private parking space

  • Connection shall be made if the meter of the resident’s flat is located at an adequate distance from the parking space and the connection is feasible.
  • Usually, a power controller is also included to efficiently distribute energy between the home and the charging station.
  • Easy accounting. Electricity bills are billed as usual.
  • Connected if there is no possibility to connect to the meter in the resident’s apartment.
  • An additional control meter is installed to report the electricity consumption for charging to the administrator.
  • The resident receives a normal bill for general services, which includes an additional amount for electricity to charge the electric car.
  • Accounting is individual and costs are reported only for the resident who uses the station.

In the common parking area

  • A plot of land belonging to a housing association is required.
  • A shared charging station is being installed.
  • The charger is connected to the house’s common meter or a separate meter is installed.
  • The charging station is used by residents who have a need. Charging sessions are paid for instantly via a mobile app.

If the community has a plot of land, we can build the entire charging infrastructure at our own expense!

Charging station for apartment buildings

Safety

Charging stations are adapted to continuously transmit electricity for 5-10 hours, and also ensure a safe charging process due to integrated protections.

Speed

Any charging station, correctly chosen for your home and your electric car, will recharge your car’s battery up to 10 times faster (compared to charging from a socket).

Comfort

Smart charging stations can be controlled by a mobile app, charge your electric car according to a set schedule and help you save money.

Investment

The electrified parking space will remain an added value in the future when selling or renting real estate.

Take advantage of the government grant and save up to 60%!

The government finances the charging stations and their installation costs.

TOP products

ELIGIBLE FOR SUPPORT
5 M. Warranty
VOOL_type2_cable_Matt-Black

931.70 961.95 

Select properties

ELIGIBLE FOR SUPPORT
Wallbox-Pulsar-Plus_white

871.20 1,055.12 

Select properties

Installation service in a private parking space

The cost of the installation work depends on the technical feasibility of the site.
The prices shown are indicative, and each case is assessed individually.

STANDARD

  • Cable installation in PVC stranded, straight or corrugated conduit (up to 20 m)
  • The pipe is fixed to the wall.
  • Unsealing the ESO electrical panel.
  • Connecting the cable to the apartment meter.
  • Installing an automatic transfer switch.
  • Installation of the switchboard.
  • Installation of an AC protection device.
  • Drilling of one wall (up to 50 cm).
  • Wall-mounted charging station.
  • Charging station configuration and instructions on how to use it.
  • We only install charging equipment purchased from us.

1090 €

EXTRA

  • Additional electrical panel for an automatic switch (if it doesn’t fit in the existing electrical cabinet).
  • Residual current operated circuit breaker.
  • Project preparation.
  • Power increasing and related processes, documentation.
  • Additional permits or other documents to install a charging station.
  • Additional electrical installation work.
  • Other.

X €

Price depends on the need for the work.

Company certificates

Environmental
standard ISO 14001

Certificate for the operation of energy
installations (E-2639)

Electrical Installation
licence (EI-0622)

Completed projects

FAQ

If you own a parking space or a garage, you do not need the consent of your neighbours. All you need to do is to get permission from the building administrator or the chairman to carry out the work once the project is ready. In rare cases, where the cable for a substation has to be installed on the frontage or dug underground in the yard, consents or approvals from the authorities may be required for the crossing. However, these are unique cases and we advise on them individually.

The installation of a private charging station requires a physical location owned by the owner of the apartment. In the absence of such a site, but on a plot of land owned by the housing association and with the agreement of the co-owners of the plot, it is possible to install a private charging station. Another option is to install a shared charging station that is accessible to all residents. In this case, the administration of the charging station is required and the charges are based on the actual charging of each user..

Individuals: for private houses, cottages, summer houses, apartment buildings or on the plot of an apartment building (private parking lawn).
Legal entities: at workplaces, in apartment buildings or on the plot of an apartment building, in the light pole.

You can apply before you have installed an EV charging point. Costs are financed as incurred from 2023 1’st April.

The required power input is determined by the parameters of the electric vehicle and the charger. First, check the maximum charging capacity (here) that your electric car can accept. For example, some EVs can charge up to a maximum of 7.4 kW (single-phase), while others can charge up to 11 kW or 22 kW (three-phase). The charging station is selected according to the parameters of the electric vehicle. The most common AC charging stations for home use a capacity between 3.7 kW and 22 kW.

For example:
If you need a 22 kW charging point and your home’s existing electricity supply is 10 kW, you will need to increase the power supply to make full use of the charging point. In this case, you should contact ESO for advice on the possibility of increasing the power of the inlet. If the inlet power is the same as charging station is requared, it is advisable to install a dynamic power controller to ensure smooth electrical operation.

We provide at least a 24-month warranty on the equipment after the installation date, but longer periods are possible (depending on the product). For installation work, we provide a 12-month warranty after the installation date.

Product categories

Manufacturer
Pasirinkite savybes
Manufacturer
Connector
Pasirinkite savybes
Connector
RFID
Pasirinkite savybes
RFID
Interface with solar power
Pasirinkite savybes
Interface with solar power
Communications
Pasirinkite savybes
Communications
Power
Pasirinkite savybes
Power
Phases
Pasirinkite savybes
Phases
Price
Price - slider
Price - inputs
App control
Pasirinkite savybes
App control
Eligible for support
Pasirinkite savybes
Eligible for support
Warranty
Pasirinkite savybes
Warranty
Colour
Pasirinkite savybes
Colour
Current
Pasirinkite savybes
Current