For multi-family

A charging station in an apartment block – mission possible.

Our services

Charging station in an apartment block

A charging point in an apartment block can be located in a private parking space or, if there is no private parking space, in a shared parking area (requires a plot of land owned by the building community).

In a private parking space

ABB Terra AC charger
  • Connection shall be made if the meter of the resident’s flat is located at an adequate distance from the parking space and the connection is feasible.
  • Usually, a power controller is also included to efficiently distribute energy between the home and the charging station.
  • Easy accounting.
    Electricity bills are billed as usual.
  • Connected if there is no possibility to connect to the meter in the resident’s apartment.
  • An additional control meter is installed to report the electricity consumption for charging to the administrator.
  • The resident receives a normal bill for general services, which includes an additional amount for electricity to charge the electric car.
  • Accounting is individual and costs are reported only for the resident who uses the station.

In the common parking area

Alfen charger
  • A plot of land belonging to a housing association is required.
  • A public bus stop is being installed.
  • The station is connected to the house’s common meter or a separate meter is installed.
  • The station is used by residents who have a need. Charging sessions are paid for instantly via a mobile app.

If the community has a plot of land, we can build the entire charging infrastructure at our own expense!

Charging station for apartment buildings

Safety

The charging stations are designed to provide 5-10 hours of continuous charging.
The charging process can last up to 5-10 minutes and ensures safe charging thanks to integrated guards.

Speed

The right stop, chosen according to the parameters of your home and your electric car, will recharge your car’s battery up to ten times faster than charging from a socket.

Comfort

Smart charging stations can be controlled by a mobile app, charge your electric car according to a set schedule and help you save money.

Investment

The electrified parking space will remain an added value in the future when selling or renting real estate.

Installation service in a private parking space

The cost of the installation work depends on the technical feasibility of the site.
The prices shown are indicative, and each case is assessed individually.

STANDARD

  • Cable installation in PVC stranded, straight or corrugated conduit (up to 20 m).
  • The pipe is fixed to the wall.
  • Unsealing the ESO shield.
  • Connecting the cable to the apartment meter.
  • Installing an automatic transfer switch.
  • Installation of the switchboard.
  • Installation of an AC protection device.
  • Drilling of one wall (up to 50 cm).
  • Wall-mounted charging station.
  • Charging station configuration and instructions on how to use it
  • We only install charging equipment purchased from us.

1090 €

EXTRA

  • Additional electrical panel for an automatic switch (if it doesn’t fit in the existing electrical cabinet).
  • Leakage relay.
  • Project preparation.
  • Capacity building and related processes, documentation.
  • Additional permits or other documents to install a charging station.
  • Additional electrical installation work.
  • Other.

X €

Price depends on the need for the work.

Our certificates

Environmental
ISO 14001

Energy Certificate
for the operation of installations (E-2639)

Installation of electrical installations
Licence (EI-0622)

Completed projects

Any questions? Contact us for a free consultation.

Fill in the short form and we will reply within 1 day.

TOP products

ELIGIBLE FOR SUPPORT
5 M. Warranty
VOOL_type2_cable_Matt-Black

931.70 961.95 

Select properties

ELIGIBLE FOR SUPPORT
Wallbox-Pulsar-Plus_white

871.20 1,055.12 

Select properties

FAQ

If you own a parking space or a garage, you do not need the consent of your neighbours. All you need to do is to get permission from the building administrator or the chairman to carry out the work once the project is ready. In rare cases, where the cable for a substation has to be installed in the frontage or dug underground in the field, consents or approvals from additional authorities may be required for the networks to be crossed. However, these are unique cases and we advise on them individually.

The installation of a private charging station requires a physical location owned by the owner of the apartment. In the absence of such a site, but on a plot of land owned by a housing association and with the agreement of the plot’s co-owners, a private charging station can be set up. Another way is to create a bus stop that is accessible to all residents. In this case, station administration and charging based on the actual charging of each user is required.

Individuals: in individual houses, cottages, gardens, apartment buildings or on the plot of an apartment building (private parking space).

Legal persons: at their workplace, in an apartment building or on the grounds of an apartment building, on or in a lighting pole (support) adjacent to an apartment building.

You can apply before you have installed an EV charging point. Costs are financed as incurred from 2023.
1 April.

The required power input is determined by the parameters of the electric vehicle and the station. First, check the maximum AC charging power (Charge Power) here that the electric car can accept. Some EVs can charge up to a maximum of 7.4 kW (single-phase), while others can charge up to 11 kW or 22 kW (three-phase). A charging station is selected based on the parameters of the electric car. AC charging stations for home use have a power range from 3.7 kW to 22 kW.

For example:
If you need a 22 kW charging station and your home electricity supply is 10 kW, you will need to increase the power supply to make full use of the charging station. In this case, you should contact ESO for advice on the possibility of increasing the input power.

If the input power is the same as the planned charging station, it is advisable to install a dynamic power controller at the same time to ensure an uninterrupted power supply.

We give you at least 24 months’ warranty on your equipment. after the date of installation, but longer periods are possible (depending on the product). We give you 12 months for installation work. warranty after the date of installation.

Product categories

Manufacturer
Pasirinkite savybes
Manufacturer
Connector
Pasirinkite savybes
Connector
RFID
Pasirinkite savybes
RFID
Charging from a solar power plant
Pasirinkite savybes
Charging from a solar power plant
Communications
Pasirinkite savybes
Communications
Power
Pasirinkite savybes
Power
Phases
Pasirinkite savybes
Phases
Price
Price - slider
Price - inputs
App control
Pasirinkite savybes
App control
Eligible for support
Pasirinkite savybes
Eligible for support
Warranty
Pasirinkite savybes
Warranty
Colour
Pasirinkite savybes
Colour
Current
Pasirinkite savybes
Current